Sign reads, 'Wood Chippings, available free to a good home' the chippings were produced from site vegetation which was cleared and shredded to facilitate the construction of the new depot.
Photographs of the steel frame being lifted into place.
Friday, 16 August 2013
The building is now starting to take shape quickly, with steel frame being erected an composite roof panels being installed.